ISO 6789 Revision Watch: What Draft Part 3 Means for Torque-Tool Verification
Last reviewed: September 23, 2026.
Organizations managing hand torque tools need to distinguish carefully between current published ISO 6789 requirements and work that is still under development.
What is published today
ISO 6789-1:2017 remains the published standard covering requirements and methods for conformance testing and marking of hand torque tools. ISO 6789-2:2017 remains the published standard covering calibration and determination of measurement uncertainty.
The official ISO hand-operated tools catalogue also shows revision projects for these parts.
What is still under development
ISO lists development work for a new Part 3 addressing performance verification of hand torque tools. The ISO 6789-3 development page is a development-stage project, not a published International Standard.
This distinction is important. Draft or committee-stage material can change before publication. It should not be used to make premature compliance claims.
Why Part 3 matters
Torque-tool programs have long needed to manage two different activities: formal calibration and checks performed between calibrations.
ILAC-G24:2022 / OIML D 10:2022 already recognizes intermediate checks as a way of maintaining confidence in measuring equipment between scheduled calibrations. A future published Part 3 could provide torque-tool-specific structure around performance verification.
That is especially relevant to factories, workshops and maintenance organizations that use in-house torque analyzers. It may create a clearer boundary between "we checked this wrench today" and "this wrench received formal calibration."
What organizations should do now
Continue referencing the applicable published editions where they are contractually or technically required. At the same time, organizations can prepare by improving the distinction between calibration and intermediate checking.
- Separate terminology. Do not call an in-house function check "ISO 6789 calibration" unless it actually meets the applicable calibration requirements.
- Predefine check limits. The acceptance criterion should exist before testing begins.
- Control reference equipment. The torque measurement device used for checking must itself be adequately controlled for the decision being made.
- Retain history. Trend results so that the check program provides evidence about drift rather than isolated snapshots.
- Define escalation. A failed check should trigger removal from controlled use and investigation.
Why the revised Part 2 work also matters
The development record for the revised Part 2 continues to center on calibration, uncertainty and certificate-related requirements. That reinforces the conceptual separation between formal calibration in Part 2 and developing performance verification in Part 3.
Avoid premature compliance claims
The strongest position in 2026 is simple: monitor the revision, prepare the process, but do not advertise compliance with an unpublished final requirement.
When new editions are formally published, review controlled procedures, contracts, accreditation scopes, equipment, training and transition requirements against the final published documents.
Frequently Asked Questions
Has ISO 6789-3 been published?
No. As of September 23, 2026, ISO lists Part 3 as a development-stage project rather than a published International Standard.
Are ISO 6789-1:2017 and ISO 6789-2:2017 still published?
Yes. The 2017 editions remain published while revision work is underway.
Should we change our torque procedure now?
You can improve terminology and intermediate-check controls now, but avoid treating draft requirements as final. Recheck the official ISO status before making binding compliance claims.
Related Reading
Workshop check vs calibration | Torque-tool intermediate checks | ISO/IEC 17025 calibration guide | Torque calibration uncertainty
Keep your torque-tool procedures aligned with published standards
Monitor the revision while keeping current procedures based on requirements that are actually published and applicable.
Authoritative Sources
Technical note: This article is date-sensitive. Recheck ISO's official project status before republishing or making compliance claims.