Sound Level Meter Field Check Log Before and After Measurement

 

Sound Level Meter Field Check Log: Template and Recordkeeping Guide

A sound level meter field check log links each noise measurement session to the equipment checks performed before and after it. A good log identifies the full measurement setup, preserves the original readings and records the basis for deciding whether the survey could proceed.

This guide includes a field-check template that can be adapted to your procedure. It does not set a universal acceptance limit or replace the instructions supplied with your sound level meter, microphone, preamplifier or acoustic calibrator.

What a field check establishes

An acoustic calibrator applies a reference signal to a compatible microphone. The meter’s response provides evidence about the assembled measurement system under the conditions of that check. It does not prove that every frequency response, level range or measurement function is operating correctly.

Periodic laboratory testing serves a different purpose. IEC 61672-3:2013 specifies a limited set of periodic tests for applicable sound level meters. A check performed in the field should still be described as a field check, even when the instrument menu labels the function “calibration.”

Prepare the log before the survey

Assign a unique session ID and use the same identifier in the associated measurement files. Record the model and serial number of the meter, microphone and acoustic calibrator before leaving for the job. Include the preamplifier, extension cable, adaptor and any other accessory that forms part of the measurement chain.

Confirm which field-check procedure applies and locate its acceptance criteria. Record the source of the expected indication, including any correction specified for the calibrator, microphone or adaptor combination. The nominal level printed on an acoustic calibrator is not necessarily the exact indication expected from every compatible microphone and meter setup.

Inspect the equipment, batteries and connections before use. Fit the specified adaptor and allow the equipment to stabilise for the period required by the manufacturer. Note any unusual environmental condition, equipment substitution or configuration change that could help explain a later result.

Copyable sound level meter field-check template

Copy this table into your controlled record or print it for field use. Complete the initial and final columns separately. The fields are intentionally blank because settings, corrections and acceptance limits depend on the equipment and procedure being used.























































Record fieldInitial checkFinal check
Session ID, location and operator
Date and time
Meter model and serial number
Microphone, preamplifier and accessories
Calibrator model, serial number and certificate reference
Selected level, frequency and meter settings
Expected indication and correction source
Observed indication before adjustment
Conditions relevant to the procedure
Acceptance criterion and procedure revision
Adjustment made and resulting indication
Decision, reviewer and linked measurement files

Make the initial and final checks comparable

Use the same equipment configuration and comparable settings for both checks. If a change is unavoidable, document it and decide whether a direct comparison remains valid. Without that record, a setup change may be mistaken for a change in instrument response.

Where the procedure requires the two indications to be compared, calculate the signed change as:

Final indication − initial indication

This calculation gives the difference between two level readings. It is not a combination of sound-energy levels. Apply the documented acceptance rule to that difference and, where required, assess each reading separately against the expected indication.

Never replace the initial observation after adjusting the meter. Keep the original reading, the adjustment made and the reading obtained afterward as separate entries. This sequence shows whether the equipment met the criterion before adjustment or only after it.

What to do when a check fails

If the final field check falls outside the applicable acceptance criterion, identify every measurement file associated with the session. Preserve those files and refer them for review before releasing the results. The next steps are explained in What to Do After a Failed Final Field Check.

The log provides a timeline for the investigation, but it does not by itself prove that every measurement collected between the checks is valid or invalid. Retain the completed log with the measurement data, equipment records and relevant calibration certificates.

Close the measurement session

Before closing the session, confirm that every field has been completed. Mark any item that does not apply and give a reason rather than leaving it blank. Check the units, timestamps, serial numbers and file references. Record who reviewed each exception, the decision reached and where the supporting review can be found.

For more detail on equipment calibration, periodic testing and field checks, read Acoustic Calibration: Instruments, Process and Field Checks.

Frequently asked questions

Does a field-check log replace laboratory calibration?

No. A field check records the response of the assembled equipment at selected conditions. Laboratory calibration or periodic testing covers the test scope agreed for the instrument and cannot be replaced by a field log.

Should the reading before adjustment be recorded?

Yes. Preserve the original reading, then record any adjustment and the resulting indication separately. Otherwise, the record cannot show how the equipment responded when it was first checked.

What should happen if the setup changes during the survey?

Record the change, the time it occurred and the measurements it may affect. If the procedure requires another field check after a configuration change, complete that check before continuing and link the result to the relevant files.